PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct Bank found by Lessner during excavation at the Administration parking lot Pic -1 (800x600).jpg Duct Bank found by Lessner during excavation at the Administration parking lot Pic -2 (800x600).jpg Duct Bank found by Lessner during excavation at the Administration parking lot Pic -3 (800x600).jpg Installing conduit at the bridge by the Administration Building (800x600).jpg Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing West (800x600).jpg Underground piping for the Tele-Data at the Administration Bldg. parking Pic -1 (800x600).jpg Underground piping for the Tele-Data at the Administration Bldg. parking Pic -2 (800x600).jpg Building rebar mats for Stair -4 (4th Floor) Facing South (800x600).jpg Building the Elev. 1,2,3 Door Frames Facing West  (800x600).jpg
Previous pageNext page Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing West (800x600)
Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing West (800x600)